🟡 Repair of bridge transition slabs completed in the village of Oprysheny on the M-19 highway

The installation of transition slabs on the bridge in Oprysheny has been completed. Repair works continue on a 12-meter bridge on the M-19 highway in the village of Oprysheny, Chernivtsi region. On the right carriageway, new transition slabs and expansion joints have already been installed, and the base for the asphalt concrete surface has been prepared.

📡 C4 — Chernivtsi